The buck and fastener inspection is the building inspector’s look at how each new window or door is attached to your house, done while the attachment can still be seen. The inspector checks the wood buck around the opening, the shims behind the frame and the anchors going into the wall, and compares all of it with the installation drawings in the product approval on your permit.

An impact window is rated as installed, so the way the frame is held to the wall matters as much as the glass. We anchor each frame the way the product was tested.

Why the fasteners have to match the drawing

When a window is tested for the High-Velocity Hurricane Zone, the Florida Building Code (Section 1626.2.2) requires the test unit to include its frame and anchorage, and the fasteners used to mount it have to be “identical in size and spacing to what is used in field installations.” The rating on the label was earned with a specific anchor layout. Change the layout and you’ve changed the window.

Section 1710.2 says the same thing from the installer’s side: windows and doors have to be anchored per the manufacturer’s published instructions “to achieve the design pressure specified.” Anchoring into a wall the manufacturer didn’t cover takes engineering showing equal or better performance.

The approval drawings are blunt about it. A single hung NOA we read from Miami-Dade’s product library says “Anchors shall be as listed, spaced as shown on details,” requires anchor embedment to reach past the stucco into the wall itself, and adds that anchoring conditions not shown in the details “are not part of this approval.” Its details give a maximum shim thickness, a minimum edge distance and a minimum embedment for each wall material.

The buck, and the inch and a half rule

The buck is the wood strip lining the opening that the window frame sits against. Section 1710.3 of the code treats it two ways, depending on thickness.

  • Under 1 1/2 inches. When the buck or shim is thinner than an inch and a half, the anchors go through the window frame, or through a clip or subframe, and fasten “directly into the masonry, concrete or other structural substrate.” The thin buck is a spacer, and the block or concrete does the holding.
  • 1 1/2 inches or more. A buck that thick has to be fastened to the masonry or concrete well enough to transfer the load, and the window anchors into the secured buck. Here the buck is part of the load path.

Either way, the code says that unless tested otherwise, the buck has to fully support the window or door frame, and shims have to be made of material that can carry the load.

Some cities add their own detail. Weston’s retrofit window affidavit says bucks go in “per the approved NOA,” and that an existing beveled buck has to be changed to a square edge buck that extends beyond the face of the window frame. A Florida engineer or architect can modify the buck or fasteners from what the NOA shows, with a signed and sealed letter or drawing.

What the inspector is looking at

FEMA’s recovery advisory on doors, windows and shutters, written after Hurricanes Irma and Maria, lists what matters where a door frame meets the wall: the “type, size, spacing, and edge distance of frame fasteners.”

On the inspection, that turns into a short list:

  • Anchor type and diameter, against the approval.
  • Spacing between anchors, as drawn in the details.
  • Edge distance, so an anchor isn’t too close to the edge of a block or slab.
  • Embedment, meaning how deep the anchor goes into the structure.
  • Shim thickness behind the frame.
  • How the buck itself is fastened.
  • Mullion attachments, where two units meet.

The Florida Division of Emergency Management’s Hurricane Retrofit Guide puts it plainly: the inspector checks that the product “was installed in compliance with the requirements of the product approval.” And under the NOA’s own terms, the building official can ask to see a full copy of it on site.

Why the inside joint stays open

In Miami-Dade, the county’s inspection page says inspectors “must have access to your work before closing/concealment.” Its fast track window permit disclosure, written for exact changeouts on houses and townhouses no taller than 30 feet at the mean roof line, spells out what that means: the contractor requests a “102 Buck and Fastener” inspection once the windows are in, but must “not caulk/seal/finish the interior frame perimeter to inspect shim space.” The same form says not to install fastener cover plates that would hide the anchors. On that permit type, the buck and fastener inspection is the final.

Other places handle it their own way. The City of Miami’s 2026 window and door checklist names two required inspections for windows and doors: the buck, and the final. Weston’s affidavit says snap-on covers that hide fasteners stay off until the attachments are approved.

What that means for you

Here is what you will see on install day:

  • The inside gap between the frame and the wall may be left open, without caulk or trim.
  • Snap-in covers over the frame screws may be set aside until after the inspection.
  • Paint touch-up around the openings should wait.

Leave those joints to us. Once the inspection passes, we seal the joints and put the covers on.

You can see where inspections fall in the whole job on our process page, and the products themselves on the impact windows and impact doors pages.

See your home with impact windows

Pick a window style, a frame color and a front door, and see them on a South Florida home.

Design your whole home
Written by the Guardian teamGuardian Impact Windows & Roofing, Deerfield Beach, FL · Certified General Contractor CGC1524314 · Certified Roofing Contractor CCC1334906

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Keep reading

More guides for your home