A mullion is the structural bar where two windows, or a window and a door, meet inside one opening. Side by side or stacked, the units each push their share of the wind load onto that bar, and the bar hands it to the wall. In Florida a mullion is treated as its own part, tested or engineered, with its own approval and its own line on the permit.
You’ll see them anywhere one opening holds more than one unit: a fixed picture window between two operable windows, a transom over a pair of sliders, a front door with glass panels at its sides.
Mullion or muntin?
People mix these up all the time. A muntin is a bar that divides the glass inside one sash, the grid look on a colonial style window. It’s part of that window. The Florida Building Code (Section 2411.3.2.2) says windows with permanent muntin bars have to be tested with the bars in place, so the grid is covered by the window’s own approval.
A mullion joins separate units. Take it out and you’d have two windows and a gap.
Why one big window becomes several
Every window and door is tested at a certain size, and Section 1709.5.1 puts the “product maximum size tested” on the label next to the design pressure. A unit can be engineered at a different size, but for most windows the frame area can’t exceed the frame area of the tested unit. In Miami-Dade and Broward, glass sizes are also capped by the ASTM E1300 standard (Section 2411.3.1.2).
So when a wall opening is bigger than any single approved unit can cover at the pressure that wall needs, it gets split into units that fit, joined by mullions. Wide openings, tall two-story glass and old picture walls are the usual candidates. On a big opening, the mullion layout is decided by the approvals and the wind load as much as by the look you want.
What the code asks of a mullion
Section 1709.8 of the building code covers mullions directly. A mullion has to be tested by an approved lab under ASTM E330 or TAS 202, or engineered using accepted practice such as AAMA 450. In the High-Velocity Hurricane Zone, testing has to follow TAS 202. Then three performance rules apply:
- Load transfer. The mullion has to carry the design pressure from the windows and doors it supports “to the rough opening substrate,” meaning the block, concrete or framing around the opening.
- Stiffness. Under that load it can’t bend more than its span divided by 175, for spans up to 13 feet 6 inches. Longer spans are limited to the span divided by 240, plus a quarter inch.
- Strength. A lab-tested mullion has to resist 1.5 times the design pressure loads of the units it holds.
To put the stiffness rule in plain numbers: a mullion spanning 9 feet, or 108 inches, can bow no more than about five-eighths of an inch under the full design load.
Mullions carry their own approvals
Because the mullion is doing structural work, it gets an approval like any window. Miami-Dade’s product library has NOAs for clipped aluminum tube mullions, with and without steel reinforcement inside, rated for both large and small missile impact. The evidence pages list static pressure tests under TAS 202 and cyclic pressure tests under TAS 203 at different spans, including a pair of horizontal sliding windows mulled to a fixed window above them.
That means a mulled opening has several approvals working at once: one for each unit and one for each mullion, plus the connection method shown in the mullion’s drawings.
What the permit asks for
Building departments want the mullions spelled out on the permit.
- Miami-Dade’s windows, shutters and doors page asks for “the sizes and product approval numbers of all mullions.” Its window and glass door checklist asks for the NOA of each window, glass door or mullion, and if one NOA covers more than one mullion or method, the applicant has to mark the mullion and connection being used.
- The City of Miami’s 2026 window and door checklist says “Identify all mullions.”
- Broward’s uniform retrofit window and door schedule has a column for whether mullion tubes are required at each opening.
Inspection follows the same logic. Weston’s retrofit window affidavit says “Mullion attachment needs inspection or you may provide photos.” The connections at each end of a mullion matter as much as the bar itself, since that’s where the load leaves the windows and enters the house.
A warning about homemade sidelights
Older front entries sometimes have glass panels beside the door that were built on site instead of coming as a tested unit. The Florida Division of Emergency Management’s Hurricane Retrofit Guide says that with field-made sidelights or transoms, it’s “highly unlikely the door frame is attached to something that can restrain the high pressures” of a hurricane, and that forces on a door and sidelight can top 800 pounds. When we replace an entry like that, the new door and sidelights have to be approved products, connected the way their approvals show.
What this means at the estimate
When the project manager measures a large opening, part of the job is figuring out how it divides: how many units, where the mullions land, and whether the opening’s span calls for a heavier mullion. That’s also when you’ll see how the split affects the look. Thin divisions between units are part of an impact window wall, so if a single unbroken pane matters to you, say so early.