The window and its product approval stay the same. What changes is what the frame fastens into and how water is kept out of the wall around it. In a concrete block (CBS) house, the window sits in a masonry opening, usually against a wood buck, and anchors go into the block or concrete. In a wood frame house, anchors go into the framing, and the window’s edges have to tie into the layers behind the stucco or siding that carry water back outside.
Some homes mix the two, such as a frame addition on a block house or a frame second story over a block first floor.
Why the wall comes first
An impact window keeps its rating only when it’s fastened to something that can carry the load. The Florida Building Code says windows and doors must be anchored “in accordance with the published manufacturer’s recommendations to achieve the design pressure specified” (Section 1710.2). It then splits the rules by what surrounds the opening: masonry, concrete or another structural substrate in Section 1710.3, and wood or other approved framing in Section 1710.4.
The wall plays its own part in the storm. For Miami-Dade and Broward, Section 1626.4 lists wall types the code treats as meeting the debris impact rules without a test: concrete masonry walls at least 8 inches thick built to the HVHZ masonry chapter, and frame walls sheathed with at least 19/32 inch plywood and finished with wire lath and stucco. The window’s job is to protect the hole in that wall.
The steps, in order
The U.S. Department of Energy publishes a window installation job aid for its weatherization crews. Its order is a good outline of any replacement:
- Measure the rough opening and confirm the new unit fits.
- Take off trim and stops, then remove the old window.
- Clean up the jamb and repair any damage.
- Replace flashing where it’s needed.
- Dry fit the window.
- Level it with shims and fasten it according to the manufacturer’s specifications.
- Make sure it operates.
- Caulk every exterior edge.
- Seal the gap between the window and the rough opening with backer rod or low expansion foam.
- Put the trim back, or replace it.
On an impact job, the fastening step carries the most weight, because the anchor type, size and spacing come from the product approval and the manufacturer’s instructions for that window.
On a block house
In a CBS wall the opening is masonry, so the frame anchors into the block or concrete, either directly or through a wood buck that is itself fastened to the masonry. The Florida Division of Emergency Management’s Hurricane Retrofit Guide describes the path a masonry fastener takes: through the window jamb, across the shim space, often through a wood buck strip, and then into the wall, set to the right tightness so the frame stays square and the sash opens and closes smoothly.
Water control works differently here. Section 1403.2 of the code requires most exterior walls to have a water-resistive barrier behind the finish and a way to drain water back out, but it exempts concrete and masonry walls designed under the code’s concrete and masonry chapters. So a block wall may have no separate barrier layer for the window to tie into, and the seal between the frame and the opening matters all the more. Caulking the new frame to the opening on both the inside and the outside is part of our standard scope.
On a wood frame house
For framing, Section 1710.4 says the unit is anchored “through the main frame or by jamb clip or subframe system or through the flange,” following the manufacturer’s published installation instructions, with shims that can carry the load. The state’s retrofit guide notes that framed openings are normally built a little bigger than the window so it can be shimmed plumb, and a gap of 1/2 to 1 inch on each side is typical. Every fastener has to be long enough to cross that gap and still bite well into the framing.
The bigger difference is water. A frame wall depends on its water-resistive barrier and on flashing that sends water out instead of into the wall cavity. Section 1405.4 requires flashing at the perimeters of exterior window and door assemblies, extending “to the surface of the exterior wall finish or to the water-resistive barrier for subsequent drainage.” Where the manufacturer’s instructions don’t cover flashing, the code calls for pan flashing at the sill plus protection at the head and sides. FEMA’s recovery advisory on doors, windows and shutters makes the same point: whatever window is chosen, it “should be carefully integrated into the wall system.” It points installers to ASTM E2112, a standard practice built around keeping water out at windows and doors.
What our crew handles
On our window contracts, the install scope covers pulling out the old units, new wood bucking, caulking each new frame inside and out, patching the stucco and drywall the install disturbs, and hauling the old windows and debris away.
Questions worth asking
- Is each wall on my house block, frame or a mix?
- What does the approval call for in each kind of wall: anchors through the frame, clips, a flange, a buck?
- On frame walls, how will the new window tie into the flashing and the water barrier?
Each install ends with the city’s inspections, and our process page walks through every step. See the window styles we install on the impact windows page and the single hung windows page.