Lauderhill, FL · Roofs, impact windows & doors

Roofing and Impact Windows in Lauderhill, FL

Lauderhill was nearly named Sunnydale. Its founder changed his mind after a friend teased that Lauderdale probably had no dales, so a city with no hills could take the name Lauderhill. The houses and condos that went up on that old dairy land are now due for new roofs and stronger glass, and we handle both, permit included.

  • Lauderhill permit package prepared
  • Condo and HOA approvals requested
  • Roofs, windows and doors
  • Hablamos español

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Roofers working on new plywood decking during a roof replacement on a one-story house
Roof replacement in progress on a Guardian job
CountyBroward
Building codeFlorida Building Code, High-Velocity Hurricane Zone
PermitsLauderhill Building Division, 3300 Inverrary Blvd.
Office daysMonday to Thursday, closed Fridays
Lauderhill homes

Built mostly in the 1970s

Close to half of the homes in Lauderhill were built in the 1970s. The Census Bureau's five year survey for 2020 to 2024 gives a median build year of 1976. Roughly a quarter more date to the 1980s and about one in eight to the 1960s, while only around one home in twenty was built in 2000 or later.

A lot of that housing is stacked. About four in ten homes sit in complexes with at least 20 units, and detached houses make up roughly three in ten. Owners live in a little over half of them.

Most of it predates the hurricane rules Broward builds to now. The county is part of the state's High-Velocity Hurricane Zone, where a house is engineered for 3-second gusts of 170 mph. Each glass opening has to pass the impact tests by itself, or hide behind a shutter that passed them.

Lauderhill history

Dairy pasture, then Inverrary

The city's history page dates Lauderhill to June 20, 1959, and calls builder and developer Herbert Sadkin its founding father. Sadkin wanted the name Sunnydale. His friend William Safire, the New York Times writer, thought it sounded like a Brooklyn neighborhood and preferred a play on hill and dale. When Sadkin pointed out that there were no hills, Safire told him there were probably no dales in Lauderdale either.

In the early years this was dairy country, and the city says cows far outnumbered people. Inverrary was laid out as a planned development, each section designed for its use before construction began. The Lauderhill Mall opened in 1966 as the first enclosed, air-conditioned mall in the southeastern United States. By the late 1970s single family homes filled the northwest section, which felt so remote at the time that residents joked they lived in the Everglades.

Aerial view of a re-roof with new decking on top and underlayment installed along the lower edge of the roof
Lauderhill permits

What goes into a Lauderhill window permit

The Building Division, part of Development Services, works out of the Ken Thurston Inverrary Community Center at 3300 Inverrary Boulevard, just north of City Hall. It is open Monday through Thursday from 7:30 a.m. to 6 p.m. and closed on Fridays. Its window, door and shutter checklist says plainly that incomplete applications will not be processed, so we send everything at once.

Five incorporated cities touch Lauderhill (Sunrise, Plantation, Tamarac, Lauderdale Lakes and Fort Lauderdale), and the Census lists small unincorporated areas on its edges, such as Roosevelt Gardens and Washington Park. A Lauderhill permit only covers property inside the city line, so we check the property record first.

  1. 1 · Notarized application and proof of cost.
    The Broward County uniform building permit application goes in filled out and notarized, together with documented proof of cost such as the signed contract. Jobs above a set value also need a recorded Notice of Commencement.
  2. 2 · A placement plan for every opening.
    The plan shows the size and location of each window or door being replaced, and whether it is a size for size swap, a new opening, or an opening that changes size. Every opening then gets its own line on the Broward uniform retrofit schedule, backed by a wind load design pressure chart.
  3. 3 · Product approvals, circled.
    Lauderhill takes either a state product approval (DBPR) or a Notice of Acceptance from Miami-Dade. Its checklist asks applicants to circle the details that apply rather than highlight them, so that is how we mark ours.
  4. 4 · Two paper sets, delivered in person.
    The checklist calls for two sets of plans submitted in person, and the city requires contractors to be registered with it. We make the trip to Inverrary Boulevard.
  5. 5 · Inspections booked the day before.
    Lauderhill inspections are scheduled by phone with the permit number by 3 p.m. the day before, and we book each one ahead.
What we install in Lauderhill

Roofs, windows and doors

Licensed in Florida as a Certified Roofing Contractor (CCC1334906) and a Certified General Contractor (CGC1524314).

Roofs

Tile, shingle, metal and flat roof replacement, and roof repair when wind lifts tiles or a valley starts to leak. If your tile looks fine but water still gets in, read about tile roof underlayment.

Roof replacement

Impact windows

Bedroom single hungs, horizontal rollers, casements and big fixed panes, each one made to the measured opening. In a condo, we order the frame color and glass your association has approved.

See impact windows

Impact doors

Sliders to the patio or pool, French doors and the front entry door, all impact rated.

See impact doors
We guard what matters most

How a Lauderhill job moves

VISIT

We come to your home for a free estimate.

PLAN

We design it with you and give you a clear price.

PERMIT

We handle the HOA and permit paperwork.

PROTECT

A Lauderhill building inspector checks the finished work and signs off on the permit.

Reviews

Homeowners in their own words

Roof went extremely well, and exactly as the process was explained to me.
LL. M.New roof
Guardian Impact windows and roof assisted me on my home and I’m beyond happy with my roof.
AAmy L.New roof
All the workers on site were very neat clean and respectful.
TThomas P.Install crew
Lauderhill questions

Good to know

Do new window frames need a Lauderhill paint permit?

Not if they come with a factory color finish. The city's paint rules leave factory finished window frames and muntins alone. If a frame gets painted later, Lauderhill allows one color, and it has to match a color already on the building. Roofs follow the same idea: the rules only apply when the roofing itself is painted.

I own a condo in Lauderhill. Who decides on new windows?

Start with your association. The city's handout on the new condominium laws notes that structural integrity reserve studies, required for condo buildings of three or more stories with more than four units, cover the roof, windows and doors. We work from your board's rules and get its written approval before we file.

¿Me pueden explicar todo en español?

Sí. Desde la medida en su casa hasta la inspección final de la ciudad de Lauderhill, le atendemos en español. Puede comunicarse con nosotros al (786) 654-8273 a cualquier hora.

Free estimate in Lauderhill

Set up a Lauderhill home visit

What happens after you send your request:

  1. 1 · We call you to set a time.
    Someone from our office calls to book a visit that works for you.
  2. 2 · We look at the whole house.
    Each opening gets measured, and if the roof is part of the job we go up and look at it.
  3. 3 · The price comes in writing.
    Nobody asks you to sign on the spot, and financing is offered with approved credit.
  4. 4 · The paperwork is ours.
    Association letter, the notarized Lauderhill application, install day and the final inspection.

Licensed and insured · Certified General Contractor CGC1524314 · Certified Roofing Contractor CCC1334906

Call any hour of the day or night; hablamos español. We are a veteran-owned company, and over 500 homeowners have left us five-star reviews on Google.

Or call 786-654-8273

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Promotional Rates End 12-01-2026

Limited time offer, 0% interest