Hollywood permits are a regular part of our work. Our permit team files each one and follows it through approval.
For the historic district and sea turtle glass rules, see our Hollywood page.
Two permit types
Hollywood’s Building Division runs permits through Accela Citizen Access, and since August 4, 2026 every new application goes through it (older permits with numbers like B24 stay in the city’s previous system). The city files window work and roof work under different record types. On our jobs, window and door replacements show up as a “Window Door Shutter Permit” and a reroof as a “Roofing Permit.” Each one gets its own number, plan review and inspection list.
The city’s window and door checklist asks for a floor plan with each product’s location, size and type, numbered to match the county retrofit schedule; the state or Miami-Dade approval for each product with the elements that apply circled or clouded; and the county’s voluntary wind load chart for buildings under 30 feet. One line surprises people: if an egress window is marked on the floor plan, the city wants an elevation drawing too. Residential reroofs are on Hollywood’s Express Permitting Service list of expedited permit types.
Intake checks the application before any reviewer sees it. We double check the value line on every Hollywood application.
Window and door inspections
The sequence on our Hollywood window permits has been a buck inspection where new bucks go in, a window attachment inspection, a door attachment inspection, and a final for the window, door and shutter permit.
At the attachment inspections, the inspector compares the label on each unit with the approval in the permit. So the labels stay on until the final, and the approval set on site has to be the one for the exact products that were installed. Inspectors also need to get at the fasteners, so the trim waits.
Roof inspections
A Hollywood reroof gets more separate visits than most cities ask for. On ours they’ve included:
- roof sheathing re-nailing
- secondary water barrier
- roof anchor sheet
- fire barrier, where the system calls for one
- shingle or tile in progress (TPO progress on a single-ply flat roof, or metal panel and accessory attachment on a metal roof)
- roofing final
Hollywood inspectors won’t climb without a ladder set up for them.
On flat roofs, the city has asked for printed pictures of every layer of the installed system, and on a shingle job the inspector wanted pictures of the shingle bundles on site. Those prints belong in the permit package on site from the first roof inspection on.
If your A/C sits on the roof, tell us at the estimate and we plan the equipment stands into the job.
The Notice of Commencement
In Hollywood the first inspection can’t happen until the Notice of Commencement is recorded, so we get it signed early. Once you’ve signed it before a notary, the recording at Broward County and the posted copy at the house are on us.
Is it really Hollywood?
Not every Hollywood mailing address is in the city. In our own records, some “Hollywood” addresses turned out to be in Pembroke Pines, Miramar, Cooper City or West Park, each with its own building department. We look up the parcel before we prepare anything.
Call (786) 654-8273 about a Hollywood house, or see our roof repair page if the roof only needs a fix.