Window and Roof Permits in Kendall and Unincorporated Miami-Dade: What to Expect

Roofers installing underlayment over new plywood

Kendall, The Hammocks, Kendale Lakes, Tamiami and Country Walk all share one permit office: Miami-Dade County. None of them is a city, so there is no city building department in the middle. For homeowners that keeps things simple: one office handles the permit.

How we handle county permits

In unincorporated Miami-Dade, including the Kendall area, our permit team files each permit and follows it through approval.

If there’s an HOA or townhouse association, its review comes first.

Making sure it’s the county

The county’s own instructions limit its permit process to properties whose folio begins with 30. The Miami-Dade Property Appraiser explains that the first two digits of a folio are the municipality code, with 30 meaning unincorporated. So the quickest check is your folio on the Property Appraiser’s site.

Don’t go by the mailing address. When we mapped our own jobs with a “Miami” mailing address, they landed in the City of Miami, Miami Gardens, South Miami and Cutler Bay, and in more than two dozen unincorporated communities. Each city in the county has its own building official and its own permits.

How the county takes a permit

Applications for unincorporated homes go through the county’s online Permit Submission Portal. After submitting you get a UP number, then a process number that starts with C, N or M.

For windows, the county’s replacement checklist has three parts: the yellow building permit application, a contact sheet, and an elevation of each wall showing which windows are changing, their sizes, their approval numbers and mullion sizes. The current approval goes in for each product, and Florida state approvals are accepted alongside county NOAs. The county’s page says plainly that incomplete packages are refused. The application is signed by the owner and notarized.

The county’s fast track disclosure form for houses and townhouses is for exact changeouts only. It also carries a rule worth knowing before you phase a job: replace more than 25% of the glazed openings and every replaced unit must be impact rated or protected.

Roof permits

Every county roofing permit uses the HVHZ Uniform Roofing Permit Application. A reroof adds the Owner’s Notification, which the roofer goes through with you item by item while you initial each one, plus the county’s hurricane mitigation forms for single-family homes and a ridge ventilation calculation. Tile roofs add the Section E tile calculations.

Inspections and their codes

We schedule each county inspection using the permit number and a three-digit code from the permit card. The codes that matter for these jobs:

  • Windows: 102 buck and fastener, then 001 final.
  • Roofs: 059 tin cap or dry-in, 063 cap sheet hot mop or in progress, 010 tile placing, then 001 final.

Inspectors work from 8 a.m. to 3:30 p.m. on weekdays. On inspection day you can follow the inspector’s route on the county’s site, and some inspections are done by video call. For roofs, the county wants an OSHA-approved ladder on site.

The Notice of Commencement

Florida law says only the owner may sign the Notice of Commencement. It’s recorded with the Clerk of the Court, and a certified copy has to be at the house. The county’s notice sheet says the inspector checks for it at the first inspection.

Kendall homeowners can reach us at (786) 654-8273, in English or Spanish. Our impact windows page covers the products themselves.

Official sources

See your home with impact windows

Pick a window style, a frame color and a front door, and see them on a South Florida home.

Design your whole home
Written by the Guardian teamGuardian Impact Windows & Roofing, Deerfield Beach, FL · Certified General Contractor CGC1524314 · Certified Roofing Contractor CCC1334906

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Keep reading

More guides for your home