Window and Roof Permits in Miramar: What to Expect

New impact windows on the side of a South Florida home

Here is what goes into a Miramar window, door or roof permit, and what our permit team handles for you.

Who can file, and how

Miramar’s Building Division (inside the Building, Planning and Zoning Department on Civic Center Place) handles window, door and roof permits. Its windows and doors package is blunt about who applies: “If a contractor is hired, then the contractor must pull the permit.” Owner/builder permits exist for residences, but the owner then has to show a photo ID matching the address and proof of ownership.

Our Miramar page already walks through the two affidavits every permit carries and the city’s rule on debris hauling. These are the parts of the package we prepare with extra care:

  • A cost breakdown of labor, materials and equipment goes in with the application.
  • The floor plan sketch has to use the same opening IDs as the county’s retrofit window and door schedule, so opening 7 on the drawing is opening 7 on the schedule.
  • On each product approval, every option that applies (the pressure rating and the opening size) gets circled.
  • On the Broward County fenestration wind load chart, the option for the building height gets circled. Signed and sealed calculations can take the chart’s place.
  • Digitally sealed plans or calculations need an Affidavit of Identical Documents.

Notice of Commencement

The package says a recorded Notice of Commencement is required when the work is valued above the threshold in Florida Statutes 713.13, and that it “should be available at the first inspection.” It points owners to the Broward County Records Division at the Governmental Center, 115 S. Andrews Avenue in Fort Lauderdale, to record it. We take care of the recording once you’ve signed.

Booking inspections

Applications, fees and inspection requests all run through the city’s Citizen Self Service portal. Miramar’s permitting page says inspections requested before 3 p.m. happen the next business day and later requests go to the second business day, and that a Monday inspection requested online on a Friday or over the weekend won’t be honored. Inspectors work Monday through Thursday.

Miramar labels its inspections with numbered codes. On our reroofs we’ve seen B167 self adhesive underlayment, B163 tin cap, B161 hot mop on flat sections, B165 roof in progress and B999 final building. Window jobs close out with the final building inspection too.

The HOA affidavit

Because the HOA affidavit is part of every package, it’s a good time to tell us if you’re in an association.

The short version

Miramar wants exact numbers and matching paperwork. We check every pressure on the schedule against the product approval before it goes in.

A Miramar permit question? (786) 654-8273 is answered 24/7.

Official sources

See your home with impact windows

Pick a window style, a frame color and a front door, and see them on a South Florida home.

Design your whole home
Written by the Guardian teamGuardian Impact Windows & Roofing, Deerfield Beach, FL · Certified General Contractor CGC1524314 · Certified Roofing Contractor CCC1334906

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Keep reading

More guides for your home