Window and Roof Permits in Plantation: What to Expect

New impact windows on the side of a South Florida home

In Plantation, a permit gets checked twice before anyone looks at the windows. First the intake staff go through every uploaded file: the type of PDF, how it’s labeled, whether the pages belong together. Only then does the application go to plan review.

Our permit team prepares each Plantation file for intake and follows the permit through approval. Our Plantation page explains the permit card code used for inspections.

What intake looks for

Plantation’s intake staff look for these:

  • “City of Plantation does not accept fillable permit applications.” The Broward application and the retrofit window and door schedule have to be uploaded as locked copies that can’t be edited.
  • The permit application goes in as one PDF with both pages, not two separate files.
  • The window and door schedule is uploaded as its own file, apart from the other pages.
  • Wind load calculations and roof uplift tests are uploaded under the category for digitally signed and sealed documents, and a floor plan under “Plans.” A file under the wrong category gets sent back to be relabeled.
  • After uploading, we finish the submittal in the portal with the final “Finish” step.

The permit card and your HOA

Plantation prints a note on its permit card that every owner in an association should read: “Issuance of a building permit by the City of Plantation does not constitute that the work permitted is approved by a COA/HOA/POA.” The city’s forms page says it plainly too: HOA or condo approval is not a condition of a Plantation building permit. The city permit and your association’s approval are two separate things, and the association part is left to the owner and the contractor.

That’s why we get the HOA approval in hand before filing.

Inspections

Plantation books inspections on its automated line or in the online portal with the permit number and the three-digit code for that inspection, and we call each one in early.

For reroofs, Plantation wants its Re-roof Hurricane Mitigation Application filed with the permit, along with the roof-to-wall affidavit and owner’s notification forms it lists, and its FAQ says a separate re-nailing inspection isn’t required. One more local rule: construction work is allowed Monday through Saturday, 7 a.m. to 8 p.m., and not on Sundays or holidays.

What you sign

The application documents we prepare and a Notice of Commencement signed before a notary. The city’s FAQ says the notice isn’t needed to apply; it has to be in by the time the permit is issued or ahead of the first inspection. Plantation’s permit card even has a line showing whether one is required and whether it’s been submitted, and we send in the recorded copy so that line is settled before work starts.

Plantation homeowners can reach us at (786) 654-8273. If the front door is part of the job, our impact doors page shows the styles.

Official sources

See your home with impact windows

Pick a window style, a frame color and a front door, and see them on a South Florida home.

Design your whole home
Written by the Guardian teamGuardian Impact Windows & Roofing, Deerfield Beach, FL · Certified General Contractor CGC1524314 · Certified Roofing Contractor CCC1334906

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Keep reading

More guides for your home