Window and Roof Permits in Sunrise: What to Expect

Roofers installing underlayment over new plywood

Sunrise has detailed rules for how permit files go in, and our permit team follows each roof and window permit through approval.

Our Sunrise page covers the walk-through permit mornings and the city’s hurricane season job site rules.

The portal and its file rules

The Building Division, part of the Community Development Department on West Oakland Park Boulevard, takes applications through its Community Development Self-Service Portal. A Sunrise application is the Broward uniform form plus the city’s own Structural Addendum, with a cover sheet when a project has more than one permit. The city’s e-Plan Review Submittal Requirements are detailed, and we follow every one. A few of the rules:

  • Submit from a desktop computer. The city says applications and documents “are not supported on mobile devices.”
  • Every file must be a PDF that isn’t locked, encrypted or password protected, with its layers (seals, signatures, notes) flattened, at 300 DPI or better.
  • Each document gets labeled by type and uploaded under the matching category in the drop-down.
  • A PDF with more than one page needs a table of contents with bookmarks.

Compare that with Plantation next door, where intake has asked us for locked, non-fillable PDFs. Same county, opposite instructions.

The Notice of Commencement

The city’s NOC instructions say the recorded Notice of Commencement has to be uploaded before inspections can go ahead, and we upload it for you.

There is also a fee step at the start. The city’s invoices say an application “is not considered received and the review will not begin until application fee(s) is paid.”

Inspections

Inspections are requested a day ahead, online or on the city’s inspection line, and the city wants the permit card and approved plans displayed at the house. Sunrise’s FAQ says to check “Today’s Inspections” between 8:00 and 8:30 a.m. for the time window. Results come back as a worksheet attached to an email. On our window permits the inspections have been concealed attachments, then final structural. On flat roofs we’ve had a mop in progress inspection before the roof was finished.

A Sunrise reroof checklist adds the asbestos statement, the HVHZ roofing application and product approvals, and, for homes insured or valued above the code’s threshold, a roof-to-wall mitigation affidavit signed by an engineer, architect or general, building or residential contractor before the final, with photos.

HOA approval

If your street has an HOA, that approval comes first. If you know your HOA meets monthly, tell us the meeting date at the estimate so the request makes it onto the agenda.

What you sign

The permit application documents we prepare, and the Notice of Commencement, signed before a notary. After that, recording it with the county and uploading it to clear the NOC hold is our job.

Sunrise homeowners can call (786) 654-8273. We also have pages on window installation in Sunrise and Sunrise roofing.

Official sources

See your home with impact windows

Pick a window style, a frame color and a front door, and see them on a South Florida home.

Design your whole home
Written by the Guardian teamGuardian Impact Windows & Roofing, Deerfield Beach, FL · Certified General Contractor CGC1524314 · Certified Roofing Contractor CCC1334906

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Promotional Rates End 12-01-2026

Limited time offer, 0% interest

Keep reading

More guides for your home