For this Pembroke Pines home, a new roof needed two HOA reviews: the neighborhood’s own association first, then the master association above it.
We put the architectural review packet together the same day the permit application went to the city. Our HOA coordinator followed the packet through both boards until it was approved, and the city issued the permit.

What the house needed
It’s a one-story stucco home with a hip roof, two small front gables and an aluminum patio cover across the back. The old roof was an S tile that had faded from clay red to a dusty pink. The homeowner chose a dark charcoal flat tile from the Saxony line, and that choice went into the HOA application.
Once the master approval letter was in hand, we ordered the tile. It was in stock, and it was delivered to the house.
On the roof
The crew tore off the old roof. Where the old tile came off, fresh plywood went down, and the valleys got new metal before anything else covered them.

The underlayment went on next, a Westlake product you can read on the sheets in the photos. The city came out for the tin cap and in-progress inspections, and the tile was loaded in stacks on every slope so the setters had it within reach.


The patio cover stayed as it was. You can see it in the tear-off shots and again in the finished ones.
Final inspection
With the last tile set, the roof went through an uplift test, which checks that the tile is holding down the way it should, and then the city’s final inspection. It passed, and the job was completed in August 2026.

If your community also runs roof changes past two boards, we put that paperwork together for you. Here is how we handle a roof replacement, and more about our work in Pembroke Pines.

Impact Windows
Impact Doors
Roofing


